Use a clear panel hierarchy
Prioritize the property name or main instruction, then give supporting information enough space to remain readable. If tenants or project details change, consider how the panel content could be updated without redesigning the full identity.
Review the support and location
Document the proposed position, approach and surrounding conditions. Posts, foundations, utilities, exposure and permissions need appropriate review. An existing support system should not be assumed suitable for a different panel or a larger sign.
MATERIALS & APPROACHES
Find the right fit.
Where it can work
- Property entrance studies
- Commercial site information
- Approved project displays
A few useful answers.
Can the panel be changed later?+
A replaceable panel can be considered, but the system should be specified for that purpose and reviewed for the site.
Are posts and installation included?+
They are not assumed. The complete support and installation scope must be verified for the project.